zde se nacházíte:
Homepage > News > Calibration of the newly built operational flow measurement in HPP Porabka

Calibration of the newly built operational flow measurement in HPP Porabka

10/27/2020

In cooperation with the Polish company Madex, the calibration of the newly built operational flow measurement on the TG1 and TG3 units in HPP Porabka (Poland) took place on 14th – 18th September 2020. The operational measurement is based on the measurement of pressure difference on turbine spiral (Winter-Kennedy method), the Gibson method was used for calibration.

The calibration on both units was successful, operational flow measurement will achieve high accuracy.