A special unit to water hammer monitoring was assembled for water management company Jihočeský vodárenský svaz during Autumn 2024. The unit, placed...
A special unit to water hammer monitoring was assembled for water management company Jihočeský vodárenský svaz during Autumn 2024. The unit, placed...
On 26th – 27th November 2024, the calibration of the newly built operational flow measurement at the unit TG3 of HPP Rożnów (Poland) was carried out...
On 3rd of October 2024 the OSC Company carried out measurement of piston axial force at refurbished turbine runner of the unit TG1 HPP Trenčín (runner...
In the half of August 2024, the annually repeated measurement of Q-H characteristics of the fire pumps was performed at pumping stations of nuclear...